Campus Network Infrastructure (CNI) Upgrades
As part of the CSU Common Network Infrastructure (CNI) program, we'll be hard at work upgrading the campus Core Network infrastructure and Access Layer throughout Summer 2023. This project supports the upgrade of our campus network to enhance teaching, learning, and access.
What is the Core Network and Access Layer?
The core network is what transfers our campus network traffic at high speeds. The access layer is what enables host computers and end users (every Hornet) to connect to the campus network.
Upgrade work includes:
- Upgrading our Core Network and Data Center from 10Gb to 100/200Gb
- Boosting building network connections from 1Gb up to 10-20Gb
- Replacing routers, switches, and security firewalls
- Transitioning all network equipment in the communications rooms of campus buildings
Brief Outages and What to Expect
To reduce impacts to you, we've made every effort to schedule work during before and after-hours timeframes, but some upgrades will unavoidably occur during academic and business hours. Generally, the outages (or "offline" time) will be brief - some mere seconds, others 15 minutes or less - when switching over from our current to new equipment. We'll communicate with building occupants and via SacSend, but you can always check the Campus Building Upgrade Schedule table for when a particular building will be upgraded.
Visit the Campus Building Upgrade Schedule and look for building signage (example, above) alerting you to upcoming upgrade and maintenance work:
Troubleshooting Tips After Upgrade Work
- Workstation PCs/laptops will pause (15-20 seconds); you may need to reboot your computer
- Telephone connections will drop; you may need to unplug/plug your phone back in
- Campus workstations using Global Protect VPN connections will need to reconnect
- Individual Wi-Fi access points will restart (laptops will switch to other nearby Wi-Fi access points in the building)
If you experience any lingering issues connecting after upgrade work is completed, please reach out to the IRT Service Desk team.
Campus Building Upgrade Schedule
See when campus buildings are scheduled for upgrades. We'll regularly update the table with specific dates and as buildings are completed.
Building/Structure | Network Upgrade Work |
---|---|
AIRC | Completed |
Alpine Hall | Completed |
Amador Hall | Completed |
American River Courtyard | Summer 2023 |
Art Sculpture Lab | Completed |
Athletics Center | Completed |
Athletics Fieldhouse | Completed |
Baseball Storage/Dugout | Completed |
Benicia Hall | Completed |
Brighton Hall | Completed |
Calaveras Hall | Completed |
Capistrano Hall | Completed |
Capital Public Radio | In Progress |
Central Plant | Completed |
Children's Center | Completed |
Del Norte Hall | Completed |
Desmond Hall | Summer 2023 |
Dining Commons | Summer 2023 |
Douglass Hall | Completed |
Draper Hall | Summer 2023 |
Eli & Edythe Broad Field House | Completed |
Environmental Health | Completed |
Eureka Hall | Completed |
Facilities Management | In Progress |
Folsom Hall | Completed |
Harper Alumni Center | Completed |
Hornet Bookstore | Completed |
Humboldt Hall | Completed |
Jenkins Hall | Completed |
Kadema Hall | Completed |
Klamath Hall | Summer 2023 |
Lassen Hall | Summer 2023 |
Library | Completed |
Mariposa Hall | Completed |
Mendocino Hall | Completed |
Modoc Hall | In Progress |
Napa Hall | Completed |
Non-Destructive Lab | Completed |
Outdoor Theatre | Completed |
Placer Hall | Completed |
Planetarium/Tschannen Building | Completed |
Parking Structure (PS3) | Future Project |
Parking Structure (PS5) | Completed |
Police Emergency Station | Completed |
Public Safety | Completed |
Receiving Warehouse | In Progress |
River Front Center | Completed |
Riverside Hall | Completed |
Riverview Hall | Summer 2023 |
Roundhouse | Completed |
Sac State Aquatic Center | In Progress |
Sac State Downtown | Completed |
Sacramento Hall | Completed |
Santa Clara Hall | Completed |
SCOE | Summer 2023 |
Sequoia Hall | Completed |
Shasta Hall | Completed |
Sierra Hall | Summer 2023 |
Solano Hall | Completed |
Stadium & Press Box | Completed |
STORC | Completed |
Studio Theatre | Completed |
Tahoe Hall | Completed |
The WELL | Completed |
Tschannen Science Complex | Completed |
University Print & Mail | Completed |
University Union | Completed |
Welcome Center | Completed |
Yosemite Hall | Completed |